91ÊÓÆµ

Project of the Day

Dec 29, 2009

RFI: Oregon Route 219 Highway Maintenance Project

The Oregon Department of Transportation has been directed to implement a six-year pilot program to contract out complete maintenance of a 26-mile section of Oregon Route 219.

Dec 28, 2009

Bingo Site Environmental Cleanup (Gateway Park)

The city of Portland is soliciting bids for the environmental cleanup of a site on Northeast Halsey Street that will be a future home to a park. The area is abutted by both a commercial district and a residential neighborhood in one of Portland's most park-deficient districts.

Dec 28, 2009

RFQ: GC for Gold Summit Monastery

The Gold Summit Monastery, part of a non-profit religious organization, is seeking a qualified general contractor for its new building to be located on Second Avenue W and Thomas in Seattle.

Dec 23, 2009

Oswego Lakefront Park

The project consists of the construction of Oswego Lakefront Park, a new urban park to be located on State Street between the Lakeshore Inn and Lake Twin Theater Building, the site of the former US Bank, in Lake Oswego. The project will feature a lakefront promenade, a rain garden, gas fireplace, a park structure containing public restrooms and storage, benches, bike racks and city artwork.

Dec 22, 2009

RFP: Troutdale Reynolds Industrial Park Phase 2 – Preliminary Engineering

The Port of Portland is soliciting proposals from experienced engineering firms capable of providing consultation, preliminary engineering, cost estimating and scheduling for Phase 2 development at the Troutdale Reynolds Industrial Park.

Dec 21, 2009

RFP: CM/GC for Chemeketa Community College Phase 1

An architectural team for Chemeketa Community College has been designing the first building to begin the transformation of the college's presence in McMinnville from an educational center to a full-service educational campus that can be accredited as such in the future.

Dec 18, 2009

Pioneer Middle School HVAC Return-Air Revisions

The Steilacoom Historical School District No. 1 is accepting bids for return-air revisions at Pioneer Middle School in DuPont, Wash. The school serves students in grades 6-8.

Dec 17, 2009

Recoating Reservoir No. 7

This project consists of the removal and recoating of the interior and the top coating of the exterior of a 4 million-gallon existing steel reservoir in Roseburg. Reservoir No. 7 is one of four reservoirs located on a large butte in north central Roseburg.

Dec 16, 2009

RFP: Courthouse Square Design Services

The Courthouse Square building at 555 Court Street N.E. in Salem is owned by Marion County and Salem Keizer Transit. The building, which was completed in 2000, has five stories above grade and one parking level below grade with approximately 163,000 gross square feet (excluding the parking level). The building houses multiple county agencies, Salem Keizer Transit and retail entities.

Dec 15, 2009

WinCo Store No. 9 Remodel Addition Sub-Bid

This project consists of the remodel addition of the single-story WinCo grocery store No. 9 at 11250 S.E. 82nd Ave. in Happy Valley. Work includes concrete foundations, CMU walls, steel structural columns and steel bar joists roof framing, single-ply roofing membrane, interior concrete floor slabs and exterior concrete slabs and walkways.

Dec 14, 2009

RFP: Consulting Engineering Services

Yamhill County is seeking proposals from qualified engineering firms to perform consulting engineering services during investigation, design and construction of the Stag Hollow Creek (Laughlin Road) Bridge replacement project. The proposal is for a geosynthetically reinforced soil abutment project.

Dec 11, 2009

Construction Manager/General Contractor for Bend High School Kitchen & Auditorium Remodel

Bend-La Pine Schools, Administrative School District No. 1, is requesting proposals from experienced construction managers and general contractors to remodel the kitchen and auditorium at Bend Senior High School in Bend. The Board of Directors has chosen the CM/GC approach over the more traditional design-bid-build approach due to the need to accelerate the work and assure budget control.



News

See All News

Commentary

See All Commentary

COMMUNITY CALENDAR