Kiewit: Columbia Boulevard Wastewater Treatment Plant
SUB-BIDS REQUESTED Kiewit: Columbia Boulevard Wastewater Treatment Plant Portland, OR Kiewit is seeking bids for Verification Coring and Soil-Cement Testing. Verification Coring to be done on soil-cement ground improvement elements […]
Emery & Sons: ASR #5 & Sorrento Pump Station Interior Finishes Bid Package
SUB-BIDS REQUESTED City of Beaverton ASR #5 & Sorrento Pump Station Project Interior Finishes Bid Package Bids will be due at 2:00 pm April 16, 2021 INVITATION FOR BIDS IS […]
Emery & Sons: ASR #5 & Sorrento Pump Station Chemical Feed and Storage Equipment Bid Package
SUB-BIDS REQUESTED City of Beaverton ASR #5 & Sorrento Pump Station Project Chemical Feed and Storage Equipment Bid Package Bids will be due at 2:00 pm April 16, 2021 INVITATION […]
Emery & Sons: ASR #5 & Sorrento Pump Station Project Fire Detection and Alarm System Bid Package
SUB-BIDS REQUESTED City of Beaverton ASR #5 & Sorrento Pump Station Project Fire Detection and Alarm System Bid Package Bids will be due at 2:00 pm April 13, 2021 INVITATION […]
Emery & Sons: ASR #5 & Sorrento Pump Station Project Framing, Insulation, and Drywall Bid Package
SUB-BIDS REQUESTED City of Beaverton ASR #5 & Sorrento Pump Station Project Framing, Insulation, and Drywall Bid Package Bids will be due at 2:00 pm April 13, 2021 INVITATION FOR […]
Lease Crutcher Lewis: Portland Community College – Sylvania Campus Library (LRC) Building – Level 2 Nursing Office
SUB-BIDS REQUESTED Portland Community College – Sylvania Campus Library (LRC) Building – Level 2 Nursing Office Bids Due: 3/31/21 by 2PM Interior alteration within the PCC Sylvania Library (LRC) Building. […]
Skanska: Shredding Systems, Inc. Building #2 & Building #3 Project
SUB-BIDS REQUESTED Shredding Systems, Inc. Building #2 & Building #3 Project Bids Due: 4/8/21 at 2pm INVITATION Skanska USA Inc. is seeking bids from Qualified Bidders for the Shredding Systems, […]
Taylor NW: Newport Corridor Improvements Project – Material Supply – 100% Design Documents Precast Concrete
SUB-BIDS REQUESTED Newport Corridor Improvements Project BID DUE: 3/30/21 – 2:00 PM Pacific Time Material Supply – 100% Design Documents Precast Concrete PRE-BID: NONE E-mail to: [email protected] Attention: Justin Barden […]
Taylor NW: Newport Corridor Improvements Project – Subcontract Work – 100% Design Documents Flagging, Material Testing, & Plumbing
SUB-BIDS REQUESTED Newport Corridor Improvements Project BID DUE: 3/25/21 – 2:00 PM Pacific Time Subcontract Work – 100% Design Documents Flagging, Material Testing, & Plumbing PRE-BID: NONE E-mail to: [email protected] […]
Robinson Construction: Kennedy Elementary Addition & Remodel
SUB-BIDS REQUESTED Kennedy Elementary Addition & Remodel Keizer, OR Bids Due: 3/25/2021 @ 2pm Bid Documents are available at: www.robcon.comSend all bids to [email protected] 8060 NE Walker Road, Hillsboro, OR […]
Perlo Construction: Trost Elementary School Renovations
SUB-BIDS REQUESTED Trost Elementary School Renovations Canby, OR Bid Date:Â Â Wednesday, 3/25/21 @ 2PM Contact: Bonnie Pillster [email protected] 11450 SW Amu St. Tualatin, Oregon 97062 P: 503.624.2090 F: 503.926.9391 W: […]
R&G Ex:cavating, Inc.: Pump Station And Force Main Improvements
SUB-BIDS REQUESTED PUMP STATION AND FORCE MAIN IMPROVEMENTS Gleneden Beach, OR Bids Due: March 18, 2021 at 2pm We are looking for sub and supplier quotes. We are an equal […]
News
- Multnomah County commits up to $101.6M for Moda Center
- Portland code changes to take effect in November
- Los Colibris project approved for Portland’s OMSI District
- Pacific Northwest projects totaling $9.9 million in top bidders | Aug. 7, 2026
- Oregon opens infrastructure grant program
- Ex-TV host claps back at Detroit officials in blight case
- 31-unit multifamily project in Portland land use review intakes | Aug. 3, 2026
- $2.4 million office renovation in Portland building permits | Aug. 3, 2026
- Transportation commission weighs ODOT budget cuts
- Lam Research planning $1.7 billion investment in Tualatin
- Pacific Northwest projects totaling $10.6 million in top bidders | July 31, 2026
- Many Oregon counties struggling to maintain their fairgrounds
Commentary
- Beware of when the debt collector comes calling | Opinion
- Assembly of a future workforce begins with an invitation | Opinion
- Beware of overlooking legal requirements for remote workers | Opinion
- Become a critical thinker and transform a workplace | Opinion
- Managing construction risks with international suppliers | Opinion
- A rally with many engines: the lesson of 2026’s first half | Opinion
- Oregon housing challenges persist despite sound and fury | Opinion
- When does an employee’s bullying become harassment? | Opinion
- Ditch disorganization — the cost of deferred decisions | Opinion
- Consider 10 common risks for healthcare construction projects | Opinion
- Clarifying the reach of a law regarding prevailing wage | Opinion
- Adjust to legal changes now to ensure compliance later | Opinion







