The Resort at Seaside Exterior Repairs
Exterior work on the Resort at Seaside includes reroofing of condo towers and elevators, replacement of roof parapet and elevator wall finishes, demolition and replacement of EIFS cladding, and other work.
Lake Hills Library Tenant Improvements
Work consists of the construction of a one-story, 9,814-square-foot tenant improvement.
Health Sciences Complex Bid Package No. 4 Sub-Bid (Under-slab Utilities and Structure)
The project consists of demolition, structural excavation and grading, structural concrete and reinforcement, structural steel, waterproofing, fire protection, plumbing/HVAC and electrical.
Furnish and Install Telecommunications Tower Re-Bid
This project was bid in June, but due to unforeseen factors affecting the scope of work and costs, the bid had to be canceled and reassessed.
401 North G Street Re-piping and Shower Surrounds
This project consists of re-piping, shower surrounds and other work at an existing 40-unit apartment building at 401 N. G St. in Tacoma, Wash.
Machias Elementary School Replacement
The Snohomish School District is accepting bids for construction of a building to replace Machias Elementary School in Snohomish, Wash.
Foss Harbor Esplanade Site 11
This project is part of a mixed-use development project. Sixty new piles will be driven to support the new esplanade. Thirty concrete piles and 30 steel pipe piles will be driven with an impact pile driver from the shore.
Slocum House Accessibility Improvements
This project consists of ADA accessibility improvements, including constructing a new restroom, remodeling an existing one, renovating some door openings and providing patch and repair and new finishes.
Qualifications-based Selection for South Waterfront Intersection Improvements
This project will add an additional southbound left-turn lane to Southwest River Parkway, lengthen the taper to the existing northbound right-turn lane to Southwest River Parkway and add an additional eastbound lane along Southwest River Parkway to Southwest Moody Avenue.
RFP: Pre-Engineered Steel Building
This project consists of a request for proposals for complete design and construction of a pre-engineered building for the Marion County Public Works complex at 5155 Silverton Road N.E. in Salem.
Construction of Sustainable/ Energy-Efficient Water House
The city of Portland is accepting bids for the construction of a 2,546-square-foot main house and a 600-square-foot accessory dwelling unit on Portland Water Bureau property at 1514 N.E. 140th Ave.
Riverview Elementary School Replacement
The Snohomish School District is accepting bids for the project to replace Riverview Elementary School, which serves approximately 400 students in grades K-6.
News
- $960,000 office renovation in Portland building permits | Aug. 10, 2026
- Two projects in historic districts in Portland land use review intakes | Aug. 10, 2026
- Multnomah County commits up to $101.6M for Moda Center
- Portland code changes to take effect in November
- Los Colibris project approved for Portland’s OMSI District
- Pacific Northwest projects totaling $9.9 million in top bidders | Aug. 7, 2026
- Oregon opens infrastructure grant program
- Ex-TV host claps back at Detroit officials in blight case
- 31-unit multifamily project in Portland land use review intakes | Aug. 3, 2026
- $2.4 million office renovation in Portland building permits | Aug. 3, 2026
- Transportation commission weighs ODOT budget cuts
- Lam Research planning $1.7 billion investment in Tualatin
Commentary
- Beware of when the debt collector comes calling | Opinion
- Assembly of a future workforce begins with an invitation | Opinion
- Beware of overlooking legal requirements for remote workers | Opinion
- Become a critical thinker and transform a workplace | Opinion
- Managing construction risks with international suppliers | Opinion
- A rally with many engines: the lesson of 2026’s first half | Opinion
- Oregon housing challenges persist despite sound and fury | Opinion
- When does an employee’s bullying become harassment? | Opinion
- Ditch disorganization — the cost of deferred decisions | Opinion
- Consider 10 common risks for healthcare construction projects | Opinion
- Clarifying the reach of a law regarding prevailing wage | Opinion
- Adjust to legal changes now to ensure compliance later | Opinion







